Wall-mounted 7.4 kW electric vehicle chargers installed at residential site in Surrey for Zest
Project summary
We delivered the design and installation of new electric vehicle charging equipment at Banstead Wood, Surrey. This was a full turnkey project, including independent connection provider (ICP) works and NICEIC-certified installation.
Key deliverables
- Installation of feeder pillar
- Cable tray installation
- Installation and commissioning of five Garo 7.4 kW wall-mounted chargers
- Excavation of trench for ducting
- New 69 kVA connection derived from the low-voltage network
Project details
Client: Zest

Other projects
ProjectsInfrastructure design and installation of 150+ chargers for large-scale electric vehicle charging hub at the NEC Campus, Birmingham for The EV Network
ProjectsLow-voltage infrastructure design and installation for new EV charger at Windsor Marina for Aqua superPower
ProjectsLow-voltage connection and feeder pillar installation to feed new EV charger at Merry Hill, West Midlands for Zest
ProjectsNationwide maintenance and rapid response package covering 18 sites and 93 high-power charge points
Maximise the performance of your grid connections and electrical infrastructure
We help you navigate complex connection requirements, optimise network capacity, and extend the life of your electrical assets.
Contact our experts