Low-voltage connection and feeder pillar installation to feed new EV charger at Merry Hill, West Midlands for Zest


Project summary

We delivered independent connection provider (ICP) works for a new electric vehicle charger installation at a car park in Merry Hill.

Scope included the design, installation and commissioning of a feeder pillar, with low-voltage connections from the point of connection to the feeder pillar.

Key deliverables

  • ICP design, including obtaining DNO and IDNO approvals
  • Supply and installation of low-voltage main cable from the point of connection to the feeder pillar, including excavation, reinstatement, tile tape, and ducts
  • Construction of civil foundation for the feeder pillar
  • Supply and installation of the feeder pillar
  • Installation of 600A heavy-duty cut-out and 600/5A CT metering chamber

Project details

Client: Zest

Zest

1 of 1
As Zest look to expand our network of charge points across the UK, Utility Line have been an important part of some of our biggest projects to date. From design and obtaining connections through to project delivery, they have provided excellent service, and we look forward to working with them in future.

Dan Harris

Operations Director at Zest