Low-voltage connection and feeder pillar installation to feed new EV charger at Merry Hill, West Midlands for Zest
Project summary
We delivered independent connection provider (ICP) works for a new electric vehicle charger installation at a car park in Merry Hill.
Scope included the design, installation and commissioning of a feeder pillar, with low-voltage connections from the point of connection to the feeder pillar.
Key deliverables
- ICP design, including obtaining DNO and IDNO approvals
- Supply and installation of low-voltage main cable from the point of connection to the feeder pillar, including excavation, reinstatement, tile tape, and ducts
- Construction of civil foundation for the feeder pillar
- Supply and installation of the feeder pillar
- Installation of 600A heavy-duty cut-out and 600/5A CT metering chamber
Project details
Client: Zest

“As Zest look to expand our network of charge points across the UK, Utility Line have been an important part of some of our biggest projects to date. From design and obtaining connections through to project delivery, they have provided excellent service, and we look forward to working with them in future.”
Dan Harris
Operations Director at Zest
Other projects
ProjectsInfrastructure design and installation of 150+ chargers for large-scale electric vehicle charging hub at the NEC Campus, Birmingham for The EV Network
ProjectsLow-voltage infrastructure design and installation for new EV charger at Windsor Marina for Aqua superPower
ProjectsLow-voltage connection and feeder pillar installation to feed new EV charger at Merry Hill, West Midlands for Zest
ProjectsNationwide maintenance and rapid response package covering 18 sites and 93 high-power charge points
Maximise the performance of your grid connections and electrical infrastructure
We help you navigate complex connection requirements, optimise network capacity, and extend the life of your electrical assets.
Contact our experts