Nationwide maintenance and rapid response package covering 18 sites and 93 high-power charge points
Project summary
We provide full maintenance across 18 sites nationwide, covering 93 high-powered electric vehicle chargers.
Our maintenance programme is delivered through three key packages:
- Response: We attend any reported outages within three hours of receiving a service request. Following an on-site inspection and maintenance report, we evaluate the findings and complete any necessary remedial works, such as replacing damaged leads or carrying out operational repairs.
- Planned maintenance: This includes scheduled upgrade works and infrastructure improvements, such as increasing site capacity to accommodate additional chargers (e.g. upgrading from four to six units).
- Grounds maintenance: Includes landscaping, cleaning chargers to maintain a professional appearance, and remedial site repairs such as damage to bollards, fencing and paving.
Project details
Client: CPO Maintenance

Other projects
ProjectsInfrastructure design and installation of 150+ chargers for large-scale electric vehicle charging hub at the NEC Campus, Birmingham for The EV Network
ProjectsLow-voltage infrastructure design and installation for new EV charger at Windsor Marina for Aqua superPower
ProjectsLow-voltage connection and feeder pillar installation to feed new EV charger at Merry Hill, West Midlands for Zest
ProjectsNationwide maintenance and rapid response package covering 18 sites and 93 high-power charge points
Maximise the performance of your grid connections and electrical infrastructure
We help you navigate complex connection requirements, optimise network capacity, and extend the life of your electrical assets.
Contact our experts