Installation of 1500 kVA substation and multiple 350 kW charging points at Blackburn service station for IONITY


Project summary

We delivered the installation of a new substation and electric vehicle charging infrastructure at a service station in Blackburn. The works included removal of the existing substation and full civil engineering for the new installation.

Key deliverables

  • Removal of existing 1500 kVA substation
  • Installation of new 1500 kVA substation and LV pillar
  • Connection of six 350 kW electric vehicle charging points to the new low-voltage pillar
  • Verification of existing earthing and low-voltage network
  • Full civil engineering works for the new substation
  • Commissioning of the site and return to service

Project details

Client: IONITY

IONITY

1 of 1
The standard of work is extremely high and product quality consistently outstanding, exceeding my expectations every time. Their staff are not only friendly but also highly skilled in their field. Efficiency and punctuality are hallmarks of their service. I highly recommend this business. Their customer service is second to none.

Andrew Workman

Territory Manager at Ionity

Maximise the performance of your grid connections and electrical infrastructure

We help you navigate complex connection requirements, optimise network capacity, and extend the life of your electrical assets.

Contact our experts