New 500 kVA package substation powering 22 properties and a commercial unit at Dollis Road, London for Perker Holdings
Project summary
We designed and installed a 500 kVA package substation to provide power to 22 residential properties and one commercial unit at Dollis Road, London.
The project was completed within 22 weeks from receipt of the purchase order. Our team produced the full high-voltage and low-voltage design within two weeks, enabling the client to progress with on-site civil works using our design for ducting installation where required.
Project details
Client: Perker Holdings
Other projects
ProjectsInfrastructure design and installation of 150+ chargers for large-scale electric vehicle charging hub at the NEC Campus, Birmingham for The EV Network
ProjectsLow-voltage infrastructure design and installation for new EV charger at Windsor Marina for Aqua superPower
ProjectsLow-voltage connection and feeder pillar installation to feed new EV charger at Merry Hill, West Midlands for Zest
ProjectsNationwide maintenance and rapid response package covering 18 sites and 93 high-power charge points
Maximise the performance of your grid connections and electrical infrastructure
We help you navigate complex connection requirements, optimise network capacity, and extend the life of your electrical assets.
Contact our experts