Low-voltage infrastructure design and installation for new EV charger at Windsor Marina for Aqua superPower
Project summary
Aqua superPower proposed the installation of a new electric vehicle charger at Windsor Marina, supplied from a low-voltage point of connection provided by SSE with an import capacity of 80 kVA.
We were appointed to deliver the independent connection provider (ICP) works, including the design and installation of low-voltage infrastructure from the point of connection to the feeder pillar. This included construction of the feeder pillar base and provision of the VR13 enclosure. Additionally, the team installed one 125 mm duct from the feeder pillar to the pontoon.
Key deliverables
- Acting as principal contractor for ICP works in compliance with CDM 2015
- Excavation and reinstatement from low-voltage point of connection to feeder pillar, including DNO/IDNO ducting and tile tape
- Construction of low-voltage feeder pillar plinth
- Supply and installation of VR13 feeder pillar enclosure
- Excavation and reinstatement from feeder pillar to pontoon, installing one 125 mm duct
- Supply and installation of 200A heavy-duty cut-out with 200/5A CT metering chamber
- Supply and installation of low-voltage cable from point of connection to feeder pillar, including termination of the 200A heavy-duty cut-out
Project details
Client: Aqua superPower
![]()
“Human attributes of ownership, trust, reliability and proactiveness are coupled with best-in-class customer service, an exceptional collaborative approach, significant in-house construction resource, and real-world professional experience, making for the ICP the connections industry deserves! It’s absolutely the reason why Utility Line is the go-to provider for our projects across the UK.”
Husnain Khan
Global Deployment Director at Aqua superPower
Other projects
ProjectsInfrastructure design and installation of 150+ chargers for large-scale electric vehicle charging hub at the NEC Campus, Birmingham for The EV Network
ProjectsLow-voltage infrastructure design and installation for new EV charger at Windsor Marina for Aqua superPower
ProjectsLow-voltage connection and feeder pillar installation to feed new EV charger at Merry Hill, West Midlands for Zest
ProjectsNationwide maintenance and rapid response package covering 18 sites and 93 high-power charge points
Maximise the performance of your grid connections and electrical infrastructure
We help you navigate complex connection requirements, optimise network capacity, and extend the life of your electrical assets.
Contact our experts