TfL Bus station installation – Crystal Palace Pantograph
Dollis Road – Perker Holdings
![Utility Line Blackburn](https://www.utilityline.co.uk/wp-content/uploads/2023/03/Blackburn-3-scaled.jpeg)
Client:
Ionity
This project required Utility Line to install a new substation and charging infrastructure at a service station in Blackburn. This project included:
- Removal of existing 1500kVA substation
- Installation of new 1500kVA station and LV pillar
- Connection of 6no. 350kW EV charging points to the new LV pillar
- Reconfirmation of existing earthing and LV network
- Full Civil Engineering works for new substation
- Commission of site and back into service works
![Utility Line Blackburn](https://www.utilityline.co.uk/wp-content/uploads/2023/03/Blackburn-2.jpeg)
![Utility Line Blackburn](https://www.utilityline.co.uk/wp-content/uploads/2023/03/Blackburn-1-scaled.jpeg)